cable laying
blue bar

Services | Projects | In Progress


< Back to In Progress Projects

Thales SSIS

Thales have been contracted by Network Rail to renew all life-expired Station Information and
Surveillance Systems (SISS) facilities at thirteen high speed stations within the current First Great
Western franchise. These works include the replacement of “retail systems” at each of the stations, specifically CCTV, PA and CIS. SISS renewal is limited to station based facilities and controls.


The following stations are to be covered as part of this project:
Bath Spa, Bristol Parkway, Bristol Temple Meads, Chippenham, Didcot Parkway, Exeter St Davids,
Newton Abbot, Pewsey, Plymouth, Swindon, Taunton, Tiverton Parkway, Totnes


Four of the stations include listed buildings as follows:
Grade 1 – Bristol Temple Meads
Grade 2 – Bath Spa, Chippenham and Taunton


The renewal works include survey, design, install, test and commission activities.

One-On's contracted works include the installation of ducting within platforms and station car parks, installation of CCTV posts and bases and the running of cables.

Concrete base construction in progress for CCTV mast

Concrete being poured

Mounting of the mast


Asphalt reinstatement

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


 
Overview
Projects
· Recent Work
· In Progress
Overview
Quality
Health & Safety
Environment
Accreditations